NAME OF PROJECT
EMPLOYER
DATE OF CONTRACT 
PERIOD OF CONSTRUCTION
VALUE OF CONTRACT
Eczacıbaşı Lüleburgaz Medicine Factory Housing Project. / Lüleburgaz
Eczacıbaşı Construction  A.Ş. 
01.07.1990
13 month 
634,525 USD
 

 DESCRIPTION

Total 72 flat in 6 blocks consisting of concrete frame and finishing works, the quantities are listed bellow. 

Formworks

28,080   

SQ.M

Reinforced concrete  

4,950     

CU.M

Suspended slab 

6,306 

SQ.M

Reinforcement 

417,550

KG

Plastering 

24,440

SQ.M

Wall tiles

995

CU.M

Slop mortar, roof  

840  

CU.M

NAME OF PROJECT
EMPLOYER
DATE OF CONTRACT 
PERIOD OF CONSTRUCTION
VALUE OF CONTRACT
Eczacıbaşı Medical Factory Construction / Lüleburgaz
Eczacıbaşı Construction  CO. 
01.05.1990
18 month 
1,646,500  USD
 

 DESCRIPTION

The work consists of Brick wall, Ceiling plaster, vacuum leveling concrete leveling concrete etc. with equanimity .as listed bellow

Brick wall

9,103  

CU.M

Ceiling Plaster  

35,807     

SQ.M

Internal Wall Plaster 

52,070

SQ.M

Column Plaster  

2,879

ML

Manhole

245

Item

External Wall Plaster

20,879

SQ.M

Leveling mortar

1,770

SQ.M

Slop concrete, roof

 25,163

SQ.M

Leveling with vacuum concrete 35,660 SQ.M
Cutting join 38,122 ML
Lentil 11,794 ML
Vertical windows concrete 316 Item
Fixing Mesh wire 12,779 SQ.M