|
DESCRIPTION
The work consists of Brick wall, Ceiling plaster,
vacuum leveling concrete leveling concrete etc. with equanimity .as listed
bellow
|
Brick
wall |
9,103
|
CU.M |
|
Ceiling
Plaster
|
35,807 |
SQ.M |
|
Internal
Wall Plaster |
52,070
|
SQ.M |
|
Column
Plaster
|
2,879
|
ML |
|
Manhole
|
245 |
Item |
|
External
Wall Plaster |
20,879 |
SQ.M |
|
Leveling
mortar |
1,770 |
SQ.M |
|
Slop concrete,
roof |
25,163 |
SQ.M |
|
Leveling
with vacuum concrete |
35,660 |
SQ.M |
|
Cutting join |
38,122 |
ML |
|
Lentil |
11,794 |
ML |
|
Vertical windows concrete |
316 |
Item |
|
Fixing Mesh wire |
12,779 |
SQ.M |
|