First page Back Continue Last page Summary Graphic
Traditional Phase 1
(Proto Def & Risk Reduction)
Takes the results of Phase 0 and "reduces risk"
Make a few prototypes
Evolve/ Improve specification
Still vulnerable
-
The sash on the window of opportunity is grabbed
Existing program management and opinions
Contractors have settled on strategy
Initial contracts written
-
On the positive side
Still not a lot of oversight
Still not a lot of money
New capabilities are still being introduced