|
Injection of NORM (Naturally Occurring Radioactive Materials) and NOW (Non-hazardous oilfield waste) into a subsurface reservoir at above fracture gradients can be accomplished if good engineering design and practices are employed. The following simple guidelines must be followed:
Engineering ahead of operations Reservoir up design mentality Process control and safety Reservoir diagnostics/monitoring
|